Walls so flatthe light hasnothing to find.

Drywall hanging, taping, mudding and finishing for homes, strata buildings and commercial spaces across Metro Vancouver. Every quote names the finish level, so you know how smooth it will be before we start.

Price your walls

A free, fixed, written quote. Two questions to start.

Or call 604-123-7669

  • L0–L5Finish level written into every quote
  • 3 coatsMinimum on every Level 4 joint
  • Pre-1990Texture and mud tested before work
  • ContainedPoly, floor cover, vacuum sanders

Hanging, taping and finishing in

VancouverRichmondBurnabyNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite Rock

About Drywall & Mudding Company

Paint hides nothing. It shows every ridge, nail pop and lazy corner left underneath it. So we hang the board tight, bed every joint, feather each coat wider than the last, and check the whole room under a raking light before your painter ever opens a can.

The right board for the room

Fire-rated Type X where the code calls for a separation, moisture-resistant board in bathrooms and basements, and sound-rated assemblies between suites.

Coats, not shortcuts

Setting compound where depth is needed, a lighter topping to finish, and full drying time between coats. In damp months we bring heat and air movement so the schedule holds.

Built for occupied homes

Plastic on doorways and vents, protection on floors, vacuum-attached sanders and a daily sweep-up. Dust-controlled is a method, not a promise we make loosely.

From bare boardto Level 5.

Drywall finishers grade their work on six levels, from board screwed to the studs up to a full skim coat. Scroll through the trade and watch a single joint get built, coat by coat.

Finish levelL0
  1. Board
  2. Tape
  3. Coat 1
  4. Coat 2
  5. Coat 3
  6. Skim
  1. Board hangingFinish level L0

    Board fastened, joints still open

    Walls and ceilings boarded tight to the framing, with screws set just below the paper. Type X, moisture-resistant and sound board go exactly where the plans and the code put them.

  2. Taping & muddingFinish level L1–3

    Tape bedded, fasteners and corners coated

    Paper tape bedded in compound on every flat joint, metal or paper-faced bead on outside corners, and a first and second coat over each screw. This is where a straight wall is made.

  3. Sanding to Level 4Finish level L4

    Three coats, feathered and sanded smooth

    A third, wider coat feathered out past each joint, then sanded with vacuum-attached sanders and checked under a work light. Our standard finish for flat paint in homes and suites.

  4. Level 5 skim coatFinish level L5

    A thin coat over the entire surface

    Everything in Level 4, plus a skim coat across the whole wall so board paper and compound take paint the same way. For dark colours, sheen paint, tall windows and walls washed by pot lights.

  5. Ceilings & popcorn removalFinish level Flat

    Tested, then scraped or skimmed flat

    Popcorn and stipple texture is sent for an asbestos test first. Once it comes back clear, we scrape or skim, finish the ceiling flat to Level 4 or 5, and leave it ready for primer.

  6. Repairs & texture matchingFinish level Match

    Cut out, rebuilt and blended in

    Holes, cracks, nail pops, settled corners and water damage cut back to sound board, rebuilt, and blended so the patch disappears. Orange peel and knockdown are matched to what is already there.

How a room goesfrom studs to smooth.

Most of a drywall job is waiting for compound to dry. We plan around it, so you always know which days the crew is in and which days the walls are just curing.

  1. Walkthrough & measure

    We look at the framing or the damage, measure walls and ceilings, check heights and access, and ask what paint and lighting the room will get.

  2. Quote by finish level

    A written, itemised price that names the board, the finish level for each room, and what is excluded. It doesn’t move unless the scope does.

  3. Test & protect

    In homes built before 1990, a licensed surveyor samples texture and mud before anything is disturbed. Then floors, doorways and vents get covered.

  4. Hang, tape, coat

    Board, tape and three or more coats, each one left to dry fully. You’ll get a day-by-day plan so you know when the crew is in and when the walls are just drying.

  5. Light check & handover

    Every wall gets a raking-light inspection. We fix what it finds, clean up, and walk the space with you before calling it primer-ready.

A signed-off sheet,not a shrug.

Before we leave, every room gets a short finish record: the board used, the level reached, how many coats went on, what the raking-light check found and how it was fixed. Your painter gets a copy, so nobody argues later about whose flaw it is.

Finish sign-offBasement suite · Burnaby, BC
Sample
Spec
Level 4 walls · Level 5 ceiling
Board
½″ regular · ⅝″ Type X at furnace room
Coats
3 on joints · skim on ceiling
Drying
24 h between coats, heat on
Light check
Passed after 2 touch-ups
Day 1 · tape
Day 4 · light check
Primer-ready. Sent to the owner and painter at 4:40 p.m.

One price, in writing,before the first screw.

Estimates are free. Bigger jobs are priced by the square foot and fixed; small repairs get a set price from a few photos. Either way, the finish level is on the page.

Repair visit

Small jobs, done properly.

For holes, cracks, nail pops and water damage. Send photos and we’ll quote a set price for the lot, then come back once the fill has dried to finish and blend it.

  • A set price from photos for most repairs
  • Two short visits: fill and bed, then finish and blend
  • Existing texture matched as closely as the wall allows
  • Primer-ready, or primed on request
Book a repair

Why painters likefollowing us.

The level is in writing
Every quote names the finish level for each wall and ceiling, so “smooth” means the same thing to you, us and your painter.
Tested before it’s touched
Pre-1990 texture and joint compound go to a lab first. If a result comes back positive, removal goes to a licensed abatement firm and is priced separately.
Contained, then cleaned
Zip walls and poly around the work area, covered returns, vacuum sanders, and a sweep and vacuum at the end of every day.
One crew, start to finish
The people who hang your board are the people who tape it and sign it off. Nobody inherits another crew’s shortcuts.

Hold a lightto it.

Light grazing across a wall stretches every tiny ridge into a long shadow. A Level 4 finish looks perfect under a ceiling light and can still show its joints when low sun or a wall washer rakes across it. Level 5 skims the entire surface, so there is nothing left for that light to find.

Level 5 is worth it when you have

  • Eggshell, satin or semi-gloss paint
  • Deep or dark colours
  • Floor-to-ceiling windows or skylights
  • Pot lights or wall washers close to the wall
  • Long hallways and tall stairwells

Not sure which you need? Tell us the paint sheen and the lighting plan, and we’ll recommend a level room by room. Many homes mix both: Level 4 in bedrooms, Level 5 in the great room.

Finish level

Light is nearly straight on. Both finishes look smooth.

Crews acrossMetro Vancouver.

Year-round, indoors, rain or shine. Our yard is in Richmond, and most of the Lower Mainland is within an hour’s drive of it.

  • Vancouver
  • Richmond
  • Burnaby
  • New Westminster
  • North Vancouver
  • West Vancouver
  • Coquitlam
  • Port Coquitlam
  • Port Moody
  • Surrey
  • Delta
  • Langley
  • White Rock
VancouverRichmondBurnabyNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite RockRings: 10, 20, 30 km from the officeOffice & yard3211 Grant McConachie Way, Richmond, BC V7B 0A4

Judged by thefirst coat of paint.

Homeowners, strata managers and builders see our work for about a day before it disappears under primer. These are the people who looked closely.

  • Our living room has west windows that made the old walls look like corduroy at sunset. After the skim coat, the evening light just slides across.
    Natalie W.Homeowner, Kitsilano
  • They tested the popcorn before quoting, told us what it would cost either way, and had the ceilings flat and primed in five working days.
    Arjun P.Condo owner, Burnaby
  • Basement suite, three weeks from board to paint. My painter said it was the first job in a while where he didn’t have to fix anyone’s corners.
    Kevin L.Homeowner, Surrey
  • We had water damage in four units after a riser leak. One crew, one schedule, and every resident got a heads-up before they arrived.
    Sandra M.Strata manager, Richmond
  • Clean sites and a finish level on every room in the quote. That makes them easy to put on a tight tenant-improvement schedule.
    Tom H.Project manager, commercial interiors

Asked on everywalkthrough.

Something we haven’t covered? Call 604-123-7669 and you’ll reach the estimator, not a call centre.

Level 4 is three coats on the joints and fasteners, sanded smooth, and suits flat paint under normal lighting. Level 5 adds a thin skim coat over the entire surface, which you want for sheen paint, dark colours, big windows or lights that graze the wall.

Tell us aboutthe walls.

A few details and we’ll come back with a free, written quote that names the finish level, or book a walkthrough if the job needs eyes on it. Most replies go out the same working day.

Request a free quote

Fields marked with an asterisk are required.

Pricing Optional
Finish level Optional
When was the building built? Optional
Work needed Optional

Photos help. After you send this, reply to our confirmation email with a few pictures of the walls or ceilings and we can often price repairs without a visit.

Your details are used only to prepare your quote. No mailing lists.