Board hangingFinish level L0
Board fastened, joints still open
Walls and ceilings boarded tight to the framing, with screws set just below the paper. Type X, moisture-resistant and sound board go exactly where the plans and the code put them.
Taping & muddingFinish level L1–3
Tape bedded, fasteners and corners coated
Paper tape bedded in compound on every flat joint, metal or paper-faced bead on outside corners, and a first and second coat over each screw. This is where a straight wall is made.
Sanding to Level 4Finish level L4
Three coats, feathered and sanded smooth
A third, wider coat feathered out past each joint, then sanded with vacuum-attached sanders and checked under a work light. Our standard finish for flat paint in homes and suites.
Level 5 skim coatFinish level L5
A thin coat over the entire surface
Everything in Level 4, plus a skim coat across the whole wall so board paper and compound take paint the same way. For dark colours, sheen paint, tall windows and walls washed by pot lights.
Ceilings & popcorn removalFinish level Flat
Tested, then scraped or skimmed flat
Popcorn and stipple texture is sent for an asbestos test first. Once it comes back clear, we scrape or skim, finish the ceiling flat to Level 4 or 5, and leave it ready for primer.
Repairs & texture matchingFinish level Match
Cut out, rebuilt and blended in
Holes, cracks, nail pops, settled corners and water damage cut back to sound board, rebuilt, and blended so the patch disappears. Orange peel and knockdown are matched to what is already there.