Beautiful floorsstart with aflat, dry base.

Hardwood, laminate, and luxury vinyl plank, supplied and installed across Metro Vancouver. We test, level, and acclimate before the first board goes down, so your floor stays tight, quiet, and flat.

Book a free measure

Samples brought to you, itemized quote after. Start with two answers.

Or call 604-123-7669

  • FreeIn-home measure and samples
  • 48–72 hAcclimation before install
  • 3/16″Max dip over 10 ft, fixed first
  • % RHMoisture logged on every job

Measuring and installing floors in

VancouverRichmondBurnabyNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite Rock

About Flooring Company

A new floor is only as good as the ground it sits on. Before a single board goes down we test for moisture, check the subfloor for flat, and let the material settle into your home’s climate. Then one crew lays it, trims it, and cleans up, so what you walk on stays tight and quiet for years.

Supply and install, one team

Choose from engineered and solid hardwood, laminate, and luxury vinyl plank, then have the same people who quoted it put it down.

Prep you can see on paper

Moisture readings, flatness checks, and the levelling we did are written into your install report, not tucked into a line called “misc.”

Condo-ready from the start

We match the underlay to your strata’s sound rules, prepare the approval paperwork, and plan around elevator bookings and quiet hours.

Five services.One standardunderfoot.

Every floor we supply or install is held to a number, not a promise. Here’s what each job includes and the spec we check before calling it done.

Acclimation in your home before install3–7 days
  1. Engineered & solid hardwoodSpec: 3–7 days

    Acclimation in your home before install

    Wide-plank engineered oak for condos and slabs, solid hardwood nailed over plywood in houses. Glue-down, nail-down, or floating, chosen for your subfloor rather than for speed.

  2. Laminate & vinyl plankSpec: 3/8″

    Expansion gap left at every wall

    Click-lock laminate and rigid-core vinyl for kitchens, basements, and busy family rooms. Water-resistant, quick to install, and set over the right underlay for the room.

  3. Subfloor prep & levellingSpec: 3/16″

    Max dip over 10 ft before boards go down

    We grind high spots, fill low ones with levelling compound, and re-screw squeaky plywood. Concrete gets a moisture test and a vapour barrier where it needs one.

  4. Stairs, trims & transitionsSpec: Per step

    Treads, risers and nosings priced one by one

    Matching treads and nosings, flush reducers at doorways, and baseboards scribed back to the new floor height, so every edge finishes as cleanly as the field.

  5. Sand & refinishSpec: 2–3 coats

    Finish over bare, freshly sanded wood

    Tired hardwood sanded back to clean timber with dust-contained equipment, stained if you like, then sealed with durable coats that cure hard underfoot.

From sample boardto final walkthrough.

Five steps, the same on a one-room condo as on a whole house. Most of the work that makes a floor last happens before install day.

  1. Samples & showroom

    Visit the showroom or borrow samples to see each plank in your own light, beside your cabinets and paint.

  2. In-home measure

    We measure every room, read moisture in the subfloor, and check it for flat with a long straightedge.

  3. Itemized quote

    Material, underlay, prep, labour, trims, and removal each get their own line. For condos we include the strata paperwork.

  4. Delivery & acclimation

    Boxes arrive early and rest in the rooms they’ll go in, with the heat on, until the wood matches your home.

  5. Install & walkthrough

    One crew lays, trims, and cleans up. We walk the floor with you and leave a care guide for the seasons ahead.

The readings,in writing.

Every install ends with a short report: the moisture readings we took, where we levelled, how long the boards acclimated and at what humidity, the underlay we used, and photos of the finished rooms. Keep it with your warranty papers, or hand it to your strata.

Install reportCondo · Burnaby, BC · Engineered oak
Sample
Area installed
642 sq ft
Subfloor
Concrete, 78% RH
Flatness
2 low spots levelled
Acclimation
72 h at 21 °C / 41% RH
Underlay
Acoustic, strata-approved
Day 1 · measure
Day 3 · finished
In-situ RH probe and pin meter readings attached

Priced by thesquare foot.Itemized by line.

Every quote follows a site measure and lists material, underlay, prep, labour, trims, and removal on their own lines. Pick the kind of job, and we’ll price the rest.

Install only

Your material, our prep and craft.

Bought flooring elsewhere? We check it’s suited to the room, acclimate it, and install it to the maker’s instructions so its warranty stays intact.

  • Labour priced per square foot by install method
  • Subfloor prep quoted separately and up front
  • Underlay and trims supplied if you need them
  • Same acclimation and flatness checks
Quote install only

Sand & refinish

Bring back the hardwood you already have.

For solid hardwood and thick-wear engineered floors. We sand to bare wood, repair damaged boards, and finish in the sheen you choose.

  • Board repairs and replacements priced per board
  • Stain samples on your floor before you decide
  • Dust-contained sanding equipment
  • Cure times and care plan in writing
Quote a refinish

Why homeowners andstratas call us back.

Measured, not guessed
Square footage comes from a site measure, not a floor-plan PDF. Waste allowance is shown as its own line, so you never pay for a pallet you don’t need.
Prep comes first
If the subfloor is wet or wavy, we say so before you buy. Levelling and moisture barriers are quoted up front, never discovered halfway through.
Strata paperwork handled
Underlay sound data, install method, and room list are packaged for your council. Elevator bookings and quiet hours go into the schedule.
A clean site, daily
Floors and hallways protected, dust contained at the saw, offcuts and old flooring hauled away at the end of every day.

Watch a room godown, row by row.

Pick a species and a format, then keep scrolling. This is the order our crews work in, and the maths behind your quote: floor area, a waste allowance that suits the pattern, and boxes to order.

10 ft straightedge · max dip 3/16″
  1. Subfloor checkedMoisture read and flatness mapped. Two low spots get levelling compound.
  2. Underlay rolledSeams taped, edges run up the wall, acoustic rating matched to the building.
  3. Rows laidJoints staggered at least 6″ row to row, with a 3/8″ gap hidden at every wall.
  4. Trimmed & finishedBaseboards scribed back, a flush transition at the doorway, the room swept clean.
Floor area
234 sq ft
Waste allowance
+8%
To order
253 sq ft · 13 boxes
Rows laid
0 / 23
Species
Format

Measures and installsacross the Lower Mainland.

Free in-home measures from North Vancouver to White Rock, with our showroom and warehouse in Richmond.

  • Vancouver
  • Richmond
  • Burnaby
  • New Westminster
  • North Vancouver
  • West Vancouver
  • Coquitlam
  • Port Coquitlam
  • Port Moody
  • Surrey
  • Delta
  • Langley
  • White Rock
VancouverRichmondBurnabyNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite RockRings: 10, 20, 30 km from the showroomShowroom & head office3211 Grant McConachie Way, Richmond, BC V7B 0A4

Floors peoplestill talk about.

Sample reviews for this demo. A floor is judged a year later, when the seasons have had their say.

  • They found a soft spot near the patio door during the measure and fixed it before the oak went in. Two winters later, not a single squeak.
    Leanne W.Homeowner, North Vancouver
  • Our strata needed the underlay test data and a signed install method. It arrived as one tidy package and council approved it the same week.
    Tomás R.Condo owner, Burnaby
  • The quote listed every line, including levelling. The final invoice matched it to the dollar, which has never happened to us before.
    Grace H.Homeowner, Richmond
  • Vinyl plank through the whole basement, stairs included, in three days. The crew cleaned up so well we moved the couch back the same night.
    Devin P.Homeowner, Surrey
  • We refinished the original fir floors instead of replacing them. They sanded, filled, and sealed them, and they look better than the day we moved in.
    Mira K.Homeowner, East Vancouver

Good questionsbefore you buy.

Something we haven’t covered? Call 604-123-7669 and talk to the person who’ll measure your floor.

Wood and wood-based floors swell or shrink until they match the temperature and humidity of the room. We deliver early and let laminate rest around 48 hours and hardwood three to seven days, with the heat on, so the boards don’t gap or cup after they’re down.

Book your freein-home measure.

Tell us about the rooms and the floor you have in mind. We’ll call to book a measure, bring samples if you’d like, and send an itemized quote after the visit. No obligation.

Request a free measure

Fields marked with an asterisk are required.

Type of job Optional
Rooms Optional

Photos help. After you send this, reply to our confirmation email with a few pictures of the rooms, any stairs, and the doorways between rooms.

Your details are used for this quote and nothing else.