Asphalt builtfrom thebase up.

Driveways, parking lots and strata roads paved across Metro Vancouver. Every quote spells out the base, the lifts and the slope, so you know exactly what you’re paying for.

Price your paving

A free, written estimate. Two questions to start.

Or call 604-123-7669

  • FreeWritten estimates on site
  • 150 mmTypical crushed base
  • 2 liftsBinder + surface on lots
  • Apr–OctMain paving season

Paving driveways, lots & strata roads in

VancouverBurnabyRichmondNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite RockMaple Ridge

About Asphalt & Paving Company

Asphalt rarely fails at the surface. It fails underneath, where the gravel was too thin, too wet or never properly compacted. So that’s where we start: a base that drains and carries weight, then asphalt that stays flat, tight and dry for years.

Hot mix raked to grade at the edges

Equipment sized to the job

Mini excavators and skid steers for tight driveways, full pavers, tandem rollers and milling heads for lots, lanes and strata roads.

Drainage settled first

We set grades so water falls to a drain or the street before any asphalt arrives. Puddles are a design problem, and we solve them on paper.

A report when we leave

Depths, mix temperatures, photos and cure-care notes for every job, so a council, owner or buyer can see exactly what went in.

Everything fromthe dirt tothe paint.

One crew handles the whole section, so nobody blames the layer below. Each service comes with the number that matters most, written into your quote.

On the spec sheet150 mm
  1. Excavation & base150 mm

    Typical crushed base under a lot

    Old surfaces removed, ground dug to depth, then crushed gravel placed and compacted in lifts. Every base is proof-rolled, and anything that moves gets dug out and replaced.

  2. Driveways & private roads50 mm

    Compacted surface lift on a driveway

    New driveways, replacements and lanes, tied cleanly into garage slabs, walkways and the city crossing. Edges are rolled and sealed so they don’t crumble.

  3. Parking lots & strata roads2 lifts

    Binder course, then surface course

    A coarse binder lift to carry the load and a fine surface lift to shed water, phased section by section so residents, tenants and customers keep their access.

  4. Mill & overlay40 mm

    Worn top milled off, new lift placed

    When the base is still sound, we grind away the tired top layer and pave a fresh one at the same height, so curbs, drains and doorways still line up.

  5. Repairs, sealcoat & lines2–3 yrs

    Typical reseal and restripe cycle

    Crack sealing, saw-cut patches, sealcoating and crisp line painting for stalls, arrows, fire lanes and accessible parking. It keeps an older surface working for longer.

From first walk-aroundto fresh lines.

Five steps, the same on a single driveway as on a forty-stall lot. The order matters: nothing gets paved until the ground under it has passed.

  1. Site walk & written spec

    We measure, probe for soft ground and watch where the water runs. Your quote lists every layer, its depth and the slope.

  2. Permits & a site plan

    Where work touches city property we apply for the permits. Strata and commercial jobs get a phasing plan and resident notices.

  3. Dig out & build the base

    Excavate, grade, place crushed gravel in compacted lifts, then proof-roll. Soft spots are replaced, never paved over.

  4. Pave & roll hot

    Hot mix is checked at the screed and rolled while it’s workable. Joints at tie-ins are cut straight and sealed.

  5. Lines, cleanup & handover

    Markings painted, site swept, and a paving report with depths, photos and cure-care notes lands in your inbox.

A record of whatwent in the ground.

Once asphalt is down, nobody can see the base again. So we write it down: the section as built, the mix temperature at the screed, where water drains, and photos of each layer before it was covered.

Paving reportDriveway replacement · Coquitlam, BC
Sample
Section as built
100 mm base · 50 mm surface
Base proof-roll
Passed · 2 soft spots replaced
Mix at the screed
148 °C
Area paved
86 m²
Base, 10:20 a.m.
Surface, 2:05 p.m.
Emailed with cure-care notes at 4:40 p.m.

Three ways to price it.All of them in writing.

Every option starts with the same free site visit and the same written cross-section. What changes is how the work is measured and billed.

Fixed project quote

One price, every layer itemized.

For driveways and one-off jobs. You get a single price built from a written cross-section, so you can compare quotes like for like instead of just comparing totals.

  • Site visit and written cross-section
  • Excavation, base, paving and cleanup in one price
  • Any change priced in writing before work starts
  • Paving report at handover
Quote my project

Unit-rate contract

Pay for what goes down.

For large lots and phased sites. Each layer has a rate per square metre, and quantities are measured and signed off together as each phase closes.

  • Rates per square metre for each layer
  • Quantities measured and agreed on site
  • Phasing that keeps the property open
  • Works across several buildings or sites
Quote unit rates

Why owners and councilscall us back.

Base first, every time
We would rather dig out a soft patch than pave over it. Every base is proof-rolled with a loaded machine before asphalt goes down.
Water has somewhere to go
Surfaces are graded to fall toward a drain or the street, so rain doesn’t sit, freeze and open up cracks over the winter.
A spec you can compare
Every quote names the base depth, the asphalt lifts and the slope. No vague “standard driveway” line items.
Sites that stay open
Phased work, flaggers where traffic needs them, and clear notices so residents, tenants and customers can still get in and out.

What’s underyour asphalt.

A surface is only as good as what holds it up. Choose how the pavement will be used, then scroll to lay the section from the native soil up. These are typical depths; yours are set by the soil and the loads on your site.

Resident, visitor and customer parking

Section depth above native soil390 mm
  1. Surface course40 mm

    Fine-graded hot mix asphalt

    Takes the wear and sheds water. Tight, smooth and dense.

  2. Binder course50 mm

    Coarse hot mix asphalt

    Spreads heavy wheel loads so the surface lift can stay thin and true.

  3. Crushed gravel base100 mm

    19 mm crushed granular, compacted in lifts

    The real foundation. Graded to slope so water leaves the surface.

  4. Granular subbase200 mm

    Coarse crushed or pit-run gravel

    Bridges soft native soil and lets water drain away from the base.

  5. Native subgradeProof-rolled

    Existing soil, proof-rolled

    Soft spots are dug out and replaced before anything goes on top.

Crews across theLower Mainland.

From the North Shore to White Rock, with our yard and estimating office in Richmond.

  • Vancouver
  • Burnaby
  • Richmond
  • New Westminster
  • North Vancouver
  • West Vancouver
  • Coquitlam
  • Port Coquitlam
  • Port Moody
  • Surrey
  • Delta
  • Langley
  • White Rock
  • Maple Ridge
VancouverBurnabyRichmondNew WestminsterNorth VancouverWest VancouverCoquitlamPort CoquitlamPort MoodySurreyDeltaLangleyWhite RockMaple RidgeRings: 10, 20, 30 km from the yardYard & estimating office3211 Grant McConachie Way, Richmond, BC V7B 0A4

Still flatwinters later.

Homeowners, councils and site managers on what it was like to have us on their property.

  • Three companies quoted our driveway. Only one wrote down how deep the gravel would be. Two winters later it’s still dead flat.
    Karen W.Homeowner, North Vancouver
  • They paved our internal road in two halves so nobody was ever locked in, and every unit got a notice a week ahead.
    Ahmed S.Strata council treasurer, Surrey
  • The care plan gave us one number for asphalt in the depreciation report. Council approved it in a single meeting.
    Lisa M.Property manager, Burnaby
  • Our loading bay used to pond after every rain. They regraded it to a new catch basin and it drains in minutes now.
    Tom R.Warehouse operations, Delta
  • Mill, overlay and a full restripe over one long weekend. The store opened Monday morning with fresh lines.
    Grace L.Retail centre manager, Richmond

Sample reviews shown for layout. Drag to read more.

Questions,answered.

Something else on your mind? Call 604-123-7669 and you’ll reach the estimator who would walk your site.

Walking on it is fine the next day. Give cars about 72 hours, longer in a heat wave, and for the first few weeks avoid turning the wheel while parked or resting kickstands and trailer jacks on it.

Get a writtenpaving estimate.

Tell us about the surface and we’ll book a free site visit, then send a fixed quote with the base depth, asphalt lifts and drainage spelled out. Paving-season dates fill from early spring.

Request a free estimate

Fields marked with an asterisk are required.

What’s there now? Optional, choose any
Timeline Optional

Photos help. After you send this, reply to our confirmation email with a few pictures of the area, including any cracks or puddles.

We only use your details to prepare your estimate. No mailing lists.