Roof replacement
2–4 daysA typical house, tear-off to cleanup
Full tear-off to the deck, soft sheathing replaced, then ice and water shield, synthetic underlayment, new flashings, balanced ventilation and architectural shingles. Cedar-shake conversions get new solid decking first.
Repairs & leak response
48 hTo tarp an active leak, where it’s safe
We trace water back to where it actually gets in, which is rarely right above the stain. Lifted shingles, cracked vent boots, failed step flashing and moss damage are fixed and photographed.
Flat & low-slope roofs
2-plySBS torch-on, or heat-welded TPO
Decks, garages, additions and commercial roofs. We rebuild the slope so water drains, detail every scupper and penetration, and choose SBS or TPO based on how the roof is used.
Siding & rainscreen
19 mmDrained air gap behind the cladding
Vinyl and fibre-cement lap siding over a ventilated rainscreen cavity, with windows and doors properly flashed, so any water that gets behind the cladding has a way back out.
Gutters, soffit & fascia
5 in.Seamless aluminum, formed on site
Seamless gutters sized to the roof, downspouts placed where the water should go, vented soffit for attic airflow, and fascia wrapped so it stops rotting behind the gutter.