Showers & wet rooms24 h
Flood test on the waterproofed pan
Custom-sloped or pre-sloped pans, continuous membrane over walls, curbs and niches, then a full day of standing water before tile goes on. Curbless entries and linear drains when the framing allows.
Bathroom floors & heat3×
Heating cable tested before, during and after setting
Uncoupling membranes over wood subfloors, electric in-floor heat laid out around the vanity and toilet, and sensors placed between cable runs. Your electrician connects the thermostat; we leave the resistance readings with you.
Kitchen backsplashes1/16″
Joint width on rectified wall tile
Subway, zellige, mosaic, slab-look porcelain and stone. Layout starts from the centre of the range or sink, outlets get clean notched cuts, and edges finish in profiles or mitres rather than raw tile.
Large-format porcelain95%
Mortar coverage, checked by lifting tiles
Panels up to 48 inches set with back-buttering, levelling clips and the right trowel notch. We lift tiles during the job to confirm full contact, because hollow spots are where big tile cracks.
Natural stone100%
Pieces dry-laid and blended before setting
Marble, travertine, slate and limestone, laid out dry first so veining and colour run evenly across the room. Set in white mortar where stone is translucent, then sealed, with a care sheet for your cleaner.